Guided Technical Completion · AI System Owner

From business intake to review-ready technical evidence.

Technical review often breaks after business handover. Business operators register systems — but technical evidence requires different knowledge, different access, and a different workspace.

EAB gives AI System Owners a structured completion workspace — so technical governance evidence is produced systematically, not assembled under audit pressure.

Structured intake workspace Role-separated fields Evidence-linked completion
Guided Technical Completion · Owner Workspace
System architecture and data input documentation
Decision output and model behaviour description
Human oversight mechanism documentation
Technical documentation per Annex IV sections
Evidence upload with obligation linkage
A controlled workspace after business intake

Not every field should appear at the same time.

Business operators and AI System Owners have different knowledge and different obligations. EAB separates the completion workspace so each role works with what they can actually answer.

Role separation

Owner Workspace After Business Intake

When the Business Operator completes system registration, the AI System Owner receives a structured technical completion workspace. Business context is pre-populated — the owner completes only what requires technical knowledge.

Architecture

System Architecture Documentation

Data inputs, model type, decision outputs, and deployment environment are documented in a structured format — not a free-text field. The documentation is linked directly to the technical documentation readiness record.

Annex IV

Technical Documentation Section by Section

Annex IV requires nine documentation sections. EAB tracks completeness section by section — with an owner, an evidence record, and a readiness status for each. Completion is measurable, not assumed.

Oversight

Human Oversight Mechanism

Article 14 human oversight documentation is completed in the owner workspace — with named oversight owner, review points, intervention capability, and documented limitations. Each element has its own evidence record.

Risk

Risk Management Record

Article 9 requires a risk management system, not a risk list. The owner documents each identified risk with an owner, a mitigation measure, and a resolution status. Risks are governed objects — not free-text notes.

Evidence

Evidence Uploaded and Linked

Evidence artefacts uploaded by the owner are automatically linked to the relevant obligation area. The supervisor receives a complete evidence picture — not a folder of unnamed files.

From business intent to technical evidence

Technical completion becomes part of the decision record.

Guided technical completion is not a form — it is a structured process that produces review-ready governance evidence for the supervisor approval that follows.

1
Business Operator

Register system and assign AI System Owner

The Business Operator registers the system with business context — purpose, deployment, sector, and applicability signals. The AI System Owner is named and receives access to the technical completion workspace.

2
AI System Owner

Complete technical documentation section by section

The owner works through structured completion tasks — architecture, outputs, oversight mechanisms, risk management, and technical documentation. Each section has a completion state. The workspace shows what is done and what remains open.

3
AI System Owner

Upload evidence and link to obligation areas

Technical evidence — test records, architecture diagrams, oversight agreements, training records — is uploaded and linked to obligation areas. The supervisor will see evidence in context, not as a file list.

4
Supervisor

Review complete technical package before approval

The supervisor receives the full technical completion record — with completion status per section, uploaded evidence, and obligation coverage. Approval is based on a complete technical governance package, not a summary.

Guided Technical Completion

Give AI System Owners the workspace to complete the record.

Technical governance evidence is not assembled under audit pressure. It is produced systematically — section by section, linked to obligations, ready for supervisor review.

EU-hosted · Anchored to CELEX 32024R1689

Get in Touch
Request More Information

Tell us about your organization and what you’re looking to address. We’ll follow up with the relevant information.